door Jop Berkhout | 2024-04-26 | News
On April 26th the newly build lab at the Radartoren has officially opened. Since the relocation of the lab last November the team worked hard to build all the infrastructure in the new building with special attention to facilities needed in the near future. This means...
door Jop Berkhout | 2024-03-23 | News
LTR: Christoph (Fraunhofer), Urs (Fraunhofer), Eva (Cooll), Johannes (Cooll). In March 2024 Cooll travelled to the Fraunhofer Institute for Solar Energy Systems (ISE) in Freiburg. Here, the thermally driven heat pump technology was tested on performance to determine...
door Jop Berkhout | 2024-02-26 | News
In February 2024 Cooll has travelled to Delft, where the testing grounds of The Green Village are located. At The Green Village, knowledge- and educational institutions, entrepreneurs, government bodies and civilians can research, experiment, validate and demonstrate...